- The current RE share in the generation mix is 12.8%, with 10.8 GW of capacity. To further push the renewable share, PLN decided to rely on hydro, geothermal, and biomass co-firing in its existing coal power plants to achieve the 23% target by 2025.
- Out of the current planned PV capacity addition in RUPTL 2021 (4.7 GWp), only 12% (0.6 GWp) is currently in the pipeline (tendered). In the distributed solar side, the growth of rooftop solar PV and the implementation of MEMR No. 26/2021, which revises the net metering scheme to 1:1, are also hindered by PLN’s 15% maximum capacity restriction.
- Development of alternative low-carbon technologies, such as electrolysis-based ammonia for fertilizer and hydrogen-based DRI process for ironmaking, are gaining interests, although most are still in a very early phase of MoU and joint study agreements.
Hydrogen

DME

Energy company greenification

Failure of CCUS